
More solar
The network operator caps what you can send out, not what you can use. Storage and an export limiter let you add panels and keep every kilowatt on site.
The cap is on what leaves the site, not on what you generate. The roof is yours to fill.
The battery soaks up what the site cannot use at noon and gives it back at six.
A G100 limiter holds the connection inside the agreement, so the network operator says yes.
Fifty to four hundred and fifty kilowatts on the roof already. Curtailed. On a zero-export connection. Or simply told the line is full.

We read your connection agreement before we draw anything, and design to the number on it.
Grid-tied projects from about £50,000, for sites spending over £2,000 a month.
An engineer, not a salesperson. You leave with a price band.
Your half-hourly readings, not an estimate. Sizing, saving and payback before anyone visits.
We file the G99 the day you sign and design to your export limit.
